Step 0 of 4

Help & User Guide

Everything you need to know about using the SCS Test Generator

Quick Start Guide

1

Enter Project Information

Fill in basic details like plant name, program, area (Body/Paint/Press), and phase (Plant/Integration).

2

Select Safety Devices

Choose the quantity for each device type in your system (60+ device types available).

3

Configure Device Details

Name each device and configure variants (muting, DLD settings, etc.).

4

Generate Report

Choose report type (Checklist/GM Audit/Both) and download your PDF test procedures.

Key Features

  • 60+ Device Types: Gateboxes, Robots, HMI, Perimeter Guards, and more
  • Smart Logic: Automatic test procedure generation based on your configuration
  • PDF Export: Professional reports ready for GM standards compliance
  • Session Management: Your progress is saved as you work

Report Types

  • Checklist Summary: Title + Device List + Checklist + Test Procedure
  • GM Audit: Title + Device List + GM Audit + Test Procedure
  • Both: Checklist + GM Audit combined
  • Optional: Include instructions page

Device Categories

Cell Devices

  • - Gatebox (T1)
  • - Perimeter Guard (T2)
  • - Safety Mat Junction Box (T4)
  • - Intercell Safety Device (T9)
  • - Adjacent Cell (T8)

Robot Devices

  • - Robot (U10)
  • - AdjacentCell Robot (U11)
  • - AGC Tunnel (T14)

Station Devices

  • - Operator Station (U1)
  • - Maintenance HMI (T3)
  • - Crosswalk (U4)
  • - Pull Cord (U6)
  • - 2-Hand Control (U9)

Plus Paint Shop (V2-V8), Press Shop (V5-V11), and many more specialized devices

Tips & Tricks

Use Quick Actions

Hover over "Quick Actions" in the header to jump directly to any step.

Session Auto-Save

Your progress is automatically saved. You can close and resume later.

Device Naming

Default names are auto-generated (e.g., Gatebox1, Gatebox2), but you can customize them.

PDF Fallback

If PDF fails, an HTML version is generated. Use your browser to print as PDF.

Frequently Asked Questions

What's the difference between Plant and Integration phase?

Plant phase is for initial facility construction and testing. Integration is for when equipment is being integrated into existing systems.

Can I edit my selections after moving to the next step?

Yes! Use the "Back" button or Quick Actions menu to return to any previous step.

What are device variants?

Variants are additional configurations like muting (for sensors), DLD (Dual Line Detection), or specific safety features that affect test procedures.

How do I start a new project?

Click "New Project" in the top-right corner. This will clear your session and start fresh.

Need More Help?

This tool generates GM-compliant safety test procedures for automotive manufacturing facilities.